Testimonial: Energy efficiency can be tough (sometimes)

For the past two years, I've been helping cities and counties prepare to install energy efficiency retrofits.

It hasn't been simple. We're working with federal grants with very particular requirements. But the challenge caters to my make-the-world-a-better-place sensibilities.

And we've got a lot of company. Energy efficiency has caught fire in the past couple years. In the corporate world, companies are installing lighting and other electrical retrofits and establishing sustainability policies that revamp manufacturing and distribution practices. Their directive is to cut waste and promote savings of not only but energy but water and other materials.

Building information modeling, which enables designers to drop energy use like a rock, is sweeping the urban construction industry and is threatening to encompass more. Managers have learned to shave significant energy costs by monitoring and adjusting power consumption before construction and during occupancy. New products are coming on light rapidly that allow greater central control and monitoring.

And utilities are reworking their distribution networks by incorporating smart grid technology that offers game-changing savings through broad energy management protocols.

Into the light

Lighting retrofits are possibly the most cost-effective of these measures. And they're much of what I'm in charge of at the San Joaquin Valley Clean Energy Organization. We've also got air conditioning, pumps and other retrofits.

Yet getting our projects installed has not been simple. From my Formica-covered table top in Fresno, I have been working to funnel federal stimulus money into the Valley economy via Energy Efficiency and Conservation Block Grants. It's been a long road. We're finally getting the projects bid, materials purchased and at least some problems resolved.

Some issues still pose difficulties. Because of the relatively low rate of reimbursement offered by the California Energy Commission for the energy efficiency retrofit measures, some of my cities and counties have struggled to find contractors. The small size of some projects haven't helped.

Get 'er done

The state has been working frantically to get jurisdictions finish their projects by the March 14, 2012 deadline. But California Energy Commission project officers can only offer advice and direction -- no extra funds.

I heard one county was able to figure out how to pay for the replacement of air conditioning units on the maximum reimbursement of $1,000 per ton. That's a pretty big deal, by the way. So I gave the woman in charge of the program a call.

She said her county had no magic bullet, just an employee who had spent years in the HVAC trade. The county purchased units from a manufacturer that certified its products as Buy American-ready and installed them itself rather than going to an outside contractor.

Energy savings American style

The SJVCEO wants to maximize the value of the American Recovery and Reinvestment Act grants my team is administering. When complete, the retrofits would save 5.4 million kilowatt hours of electricity. We want to save all that energy.

However, about four months remain before our deadline to complete the work, and a number of our jurisdictions still need contractors. Many of our cities don't have the staff to do their own retrofits. All have had to make drastic budget cuts because of the economic slide of the past few years.

We discovered almost immediately that because of the reimbursement rates our jurisdictions were having trouble attracting interest even in this down economy. Requests for proposal issued by several cities turned up no interested bidders, while others came in with bids that far exceeded reimbursement costs.

Finding solutions

My boss charged my co-worker Sandy Nax and I to come up with a solution. We followed the formula of using a sole proprietor who has no employees and does all the work himself, thus avoiding Davis Bacon wage rates. But this work is difficult for one person.

Sandy tracked down names using an online contractor search engine and California's Contractors State License Board listings, and I started cold calling.

I eventually called 83 contractors all over the San Joaquin Valley. Three contractors expressed interest in air conditioning retrofits.

I'm hopeful we'll find lighting contractors interested as well. I'm not so sure about pump retrofits, but we all have our fingers crossed.

Nothing's simple with grants

I've been on the phone a lot explaining how the process works. Reimbursement is likely going to be slow, making it tough for contractors already strapped by an unforgiving economy.

I did reach a friendly contractor in Kingsburg who said, "I'm not interested in anything to do with the government." I get that. Seriously, I do. Working within the strict confines of federal grant requirements is enough to make anybody relate to rocker George Thorogood's request for "one bourbon, one scotch and one beer."

Maybe when the job's done. We're determined to make this work.

Photo: Corcoran pump 9A where we have retrofits planned.

Energy efficiency and the Enterprise: I'm giving it all she's got captain

In about three months, most of the energy efficiency work I've been trying to get done the past two years must be complete.

So far, only a fraction has been put in place.

It's making me a little frantic to say the least. I feel like Montgomery Scott in the engine room of the Enterprise in an early episode of the original "Star Trek." Captain Kirk is on the bridge sweating buckets. The ship is surrounded by five Klingon warrior-class vessels pummeling its shields with everything in their arsenals.

Kirk: "Scotty, get us out of here."

Scott: (Without brogue) "I can't change the laws of physics. I've got to have 30 minutes."

Montgomery Scott: Mentor

I'm imagining the scene. Purists would point out how I sloppily combined several events. But Scotty somehow figured to pull a miracle every time even while saying, "I've given her all she's got captain, an' I canna give her no more." Or "The shape the thing's in, it's hard to keep it from blowin'."

He's my mentor when I feel overwhelmed. (Others of my generation likely can relate. I grew up in the 1960s in front of a black-and-white console TV.) And, at least in this case, his coaching via mental reruns appears to have helped.

The project started two years ago with great fanfare. The American Recovery and Reinvestment Act was meant to immediately inject cash into the economy and put people to work.

Slow, government crossing

Many know it by another name: stimulus money. I work with Energy Efficiency and Conservation Block Grants. They're very specific, targeting retrofits that generate immediate energy savings and instant payback in reduced utility bills.

On my list for the 34 cities and three counties I work with are mostly lights, air conditioning units and pump motors. All told, the savings will amount to 5.4 million kilowatt hours, or, depending on how you calculate it, about the same amount in pounds of carbon dioxide-equivalent greenhouse gases.

No slouch there.

Retrofits save $

But turning grant money into pretty new T8 fluorescent and LED or induction lighting, SEER 13 ACs and premium efficiency custom motors has not been easy. After many regulatory hurdles, I finally got the go-ahead only to discover contracting the work out brought on its own hurdles.

Turns out that what the government will pay for the job didn't cover most contractors' costs. And my projects needed revisions and extra legwork. Two years is a long time and some projects that look good in 2009 don't work in 2012.

Now I've collected a crew of capable contractors willing to take on razor-thin margins to make the projects work. I'm going through each project and dealing with dozens of questions, problems and hassles.

"It's ... uh ... it's green!"

But now on the eve of the holidays, I believe we can make a go of it. Or at least a sporting fight. My contact at the California Energy Commission, who is working overtime to assist me, sometimes wonders whether we can pull it off and get all the measures installed before the money disappears.

After all, the clock on the project is ticking.

But I've got Scott's TV voice echoing in my mind. It's pointing out the stark reality (something like "This jury-rigging won't last for long" and "The warp drive is a hopeless pile of junk") while giving me the confidence to figure a solution before the end of the episode.

Alaska's largest city buys big into LED street lights

Anchorage winters are long.

While not as oppressive as those of Point Barrow on the Arctic Ocean, the long nights require decent man-made lighting to illuminate the often snow-packed and ice-frosted roads. And that makes street lights important.

The project is similar to one by the San Joaquin Valley Clean Energy Partnership, which is working with 19 cities and one county and Pacific Gas and Electric Co. to install energy saving LED street lights from Wasco to Selma and San Joaquin to Madera County and Gustine.

The effort by the Municipality of Anchorage, however, is massive with more than 16,000 street lights. The partnership's program is comparatively small with 2,136 lights.

The Anchorage Assembly approved phase one, and 4,000 LED fixtures have been installed, city officials say.

"At an initial investment of $2.2 million and an annual savings of $360,000, these fixtures will pay for themselves in less than seven years," they say.

Here's Sen. Mark Begich, D-Alaska, discussing the projet at a a U.S. Conference of Mayors meeting in June 2010.



Begich, a former Anchorage mayor and long-time staffer, says he made sure to involve the community in the decision to swap the lights. He says the directive was to save money, but "let's make sure the end user appreciates the light." He also encourages other cities to follow with their own projects.

The Valley project, paid for with Energy Efficiency Conservation Block Grant funds, is nearly complete. The lighting saves cash-strapped Valley communities money and offers gives a whole new perspective on street lighting.

Expect to see more street lights with the distinctive bright LED light. PG&E is complementing the partnership's program with a separate on-bill financing opportunity, and many cities are taking the utility up on the work.

The end result is a smaller energy bill and better solvency in a tough economic time.

Alaska's largest city is making a big deal of the installation, at least on its website. City officials boast: "Anchorage is blazing the trail in streetlight improvement policies, and communities across the state, the country, and around the world are watching closely to follow our lead."

Anchorage often goes all out to boast of its accomplishments. If it doesn't, nobody pays attention. But the message is sound. Energy efficiency works.

Photo: PG&E replacing street lights with LED fixtures in Napa.

Firebaugh finds green beyond its verdant fields

The City of Firebaugh is now home to a total of 81 brand new light emitting diode, or LED, street lights, and they’re casting a brighter glow on City streets than the old high-pressure sodium bulbs they replaced.

The new lights are also significantly more energy efficient, saving the City much needed cash on its utility bills.

What this means to the average taxpayer is significant savings to City coffers through lower utility bills. The energy efficiency retrofits when complete will save the City about 26,516 kilowatt hours of energy per year. This roughly equates to a savings of about $3,372 a year.

And that’s a big deal in these troubled economic times.

Another big deal is that the entire project isn’t costing the City a dime. The money that makes the project possible comes from an Energy Efficiency and Conservation Block Grant provided through the American Recovery and Reinvestment Act of 2009. The program is administered through the U.S. Department of Energy and the California Energy Commission.

The project is one of several the City is pursuing to improve its future. The west-side Fresno County community of 7,000 hasn't let size get in its way of its ambitions, attracting solar and biofuel interests and pursuing sustainability.

Firebaugh's long-term strategy is to lower its greenhouse gas footprint and improve its quality of life. The City is working with the U.S. Department of Housing and Urban Development through its Sustainable Communities Initiative. The goal of the program is to provide equitable development, planning and development approaches for achieving shared prosperity.

The City also launched an effort to better connect with the free-flowing San Joaquin River. The community began as a ferry crossing when most traffic into the Valley traveled via a much more robust waterway.

For the street light project, Firebaugh joined with 35 other cities and counties in the region to form the San Joaquin Valley Clean Energy Partnership, which is led by the San Joaquin Valley Unified Air Pollution Control District with the assistance of the nonprofit San Joaquin Valley Clean Energy Organization. The Partnership administers the more than $4 million in grants and provides technical assistance to local governments.

The City worked with Pacific Gas and Electric Co., which installed the lights through its LED street light retrofit program.